Start with the property.
Mountain access, freeze-thaw cycles, snow loading, drainage, and a compressed outdoor construction season all shape work in Park City. Mafi builds those constraints into scope, sequencing, mobilization, and closeout.
The site is in Summit County and Wasatch County. Because the municipality crosses county lines, verify the parcel's county as well as the city before arranging permits, utility work, or inspections.
What we can build.
Rooftop unit replacements, heat-pump installations, ductwork, commercial ventilation, hydronic piping, and tenant mechanical buildouts can be assembled into one coordinated package. The plan can include equipment supports, roof penetrations, condensate routes, controls, electrical connections, startup, and balancing.
- Packaged units and changeouts
- Central plants and hydronics
- Ductwork and air distribution
- Heat pumps and high-efficiency systems
- Kitchen and specialty ventilation
- Controls, startup, and balancing
Choose the right scope.
Before replacing equipment in kind, verify building use, loads, ventilation, existing distribution, available electrical or fuel capacity, and equipment access. A capacity problem may come from controls or airflow as well as the unit itself. Confirm who provides curbs, lifting, temporary protection, and controls integration so those interfaces do not become late extras.
Plan the work in order.
Survey and define performance requirements, confirm the equipment selection, coordinate submittals and procurement, then schedule the lifting and shutdown window. Rough connections and supports must be ready before installation. Startup follows verified power, controls, piping, airflow, and safety conditions.
- Assess load and condition
- Coordinate equipment and access
- Install, start, and balance
Verify the finished work.
Turnover can include startup records, balancing results, control settings, equipment identification, maintenance access, owner orientation, and warranty documents. A running unit is only one part of verifying the completed mechanical scope.